MAXTA predicts gold recovery at Ban Houayxai
The Problem: In 2018, PanAust’s Ban Houayxai gold-silver operation in northern Laos faced a challenging issue: infrequent episodes of […]
Read More… from MAXTA predicts gold recovery at Ban Houayxai
Enable accurate product tracking from the in-situ resource through to the plant, load out, tailings and all stages in between
Achieve more accurate predictions of plant performance in the block model
Build a digital twin using years of historical mining and operational data which can equate to hundreds of millions of material mined and processed
Consistent and reliable metal recovery estimates in your block model provides confidence in decision making, plant operations and an ability to improve.
Understanding and predicting plant performance for different ore types can be difficult and the mine feedstock is not always consistent.
MAXTAProdSpec builds a digital twin using years of historical mining and operating data which equates to thousands of tonnes of mined and processed resource.
This creates a feedback loop between real plant performance and resource model knowledge for accurate estimation of metal recovery in your block model.
Achieving consistent plant throughput is a significant operating KPI. Understanding product variability and how it impacts throughput is critical in achieving throughput targets.
MAXTAProdSpec better informs the block model of plant throughput estimates using historical mine operating data.
Through the creation of a digital twin a relationship between ore properties in the block model and plant throughput is developed. This allows more accurate prediction of plant throughput in the block model.
When utilised by scheduling and planning engineers, options for blending and stockpiling of problematic ore material can be explored.
The Problem: In 2018, PanAust’s Ban Houayxai gold-silver operation in northern Laos faced a challenging issue: infrequent episodes of […]
Read More… from MAXTA predicts gold recovery at Ban Houayxai
The Problem: A very large iron ore operation in Australia with multiple AG mill grinding and processing trains required […]
Combine with MAXTA to add insights, automation and optimisation to each digital twin application
Increase productivity, recovery and energy efficiency by showing engineers and supervisors how they achieve their ‘best performance’ through better informed mine scheduling and planning.
Request a demo